Polymer-modified asphalt waterproof coating and construction method

2022-04-03   Pageview:774

Polymer Modified Asphalt Waterproof Coating

This type of waterproof coating is made of water-emulsion (water-based) or solvent-based waterproof coating.

1) Grade IV roof waterproofing project. wax modified asphalt mixtures It can also be used as a waterproof fortification and waterproofing of toilets and bathrooms in roofing projects with a waterproof grade of II.

2) Solvent-based coatings are suitable for roof waterproofing projects with waterproof grades III and IV. It can also be used as a fortification for roofing engineering and underground waterproofing engineering with a waterproof grade of II.

Construction method of polymer-modified asphalt waterproof coating

Construction technology

⑴The base layer should be smooth, dry, clean and free of oil stains. First, use tools such as shovels and brooms to remove the floating ash on the surface, fall off the surface layer and sundries. If there is oil pollution, use gasoline and other solvents to clean it before construction.

(2) The pipe parts should be smoothed and calendered, and the installation of the pipe casing should be checked firmly, the joints should be tight, and there should be no looseness.

Construction of waterproof coating

(1) Coating primer: evenly brush the coating material on the surface of the base layer. When brushing, it should not be piled up or exposed to the bottom. The coating amount should be 0.2 ~ 0.3kg/m2, and the primer should be cured for more than 5 hours. to proceed to the next step of construction.

⑵Waterproof coating construction: The coating material should be brushed several times in a small amount to make the coating thickness uniform and reduce air bubbles. A coating amount of 0.4 to 0.5 kg/m2 is appropriate, and the thickness is about 0.4 to 0.5 mm. After the shou film is applied, it generally needs to be cured for more than 5 hours. When the finger touch is basically not sticky, the film is applied twice in the vertical direction. The inner corner of the bottom plate and the wall should be laid with fiber non-woven fabric for reinforcement treatment. . Pipes, equipment foundations, around the floor drain, and the yin and yang corners of the ground should be enhanced and painted, and the walls should be painted within 30 cm from the ground, and should be painted 3 to 4 times. It is advisable to brush 2 to 3 times for the plane base. According to the national standard, the thickness of waterproof coating film is not less than 2mm as qualified.

As the most important part of the decoration of the building, the waterproofing project must not be taken lightly. In many cases, it is best to supervise the construction by ourselves. After all, if the waterproofing is not done well, there are many troubles and great losses.

*
*

Leave a message

Contact Us
Your name(optional)

* Please enter your name
* Email address

Email is required. This email is not valid
* How can we help you?

Massage is required.
Contact Us

We’ll get back to you soon

Done